Proposition B - Public Services Complex

Project Cost: $33,000,000


Project Details:

  • Construction of a Public Services Complex
  • Proposed complex would house Public Works, Utilities, Parks, Fleet Maintenance, Building Maintenance, Engineering and Capital Projects departments
  • Proposed complex would provide proper office space, adequately shelter large equipment, and centralize city services including vehicle fleet maintenance and fueling station

 Public Services Building Option 1-3-23_0707

Proposed Project Location:

  • Airport Avenue next to the current Parks and Recreation Facility

LocationMap_PublicServicesComplex

Why is a Public Services Complex Needed?

  • Several of the buildings are over 50 years old and no longer meet the City’s needs and growth.
  • Several facilities in the floodway have flooded 3 times since 2015 and the Brazos Riverbank is sloughing and encroaching into the property.
  • The Public Services departments are spread out in separate facilities, causing inefficiencies.
  • These facilities are operating at or beyond capacity and need to be expanded to meet the needs of current and future growth in staff.
  • American Disability Act (ADA) and Texas Accessibility Standards (TAS) are not being met in older buildings.
  • The fuel island is 27 years old, and the useful life of the underground tanks is 30 years at which time they would have to be replaced.
  • There is not adequate space for vehicles, equipment, tools and supplies to maintain and store over 300 pieces of rolling stock.
  • Tools, equipment and supplies are not properly secured.
Bond Project FAQs (2)
Bond Project FAQs
Bond Project FAQs (1)